A Survey To Find The Optimum Potentials In 5 Stations In kohkiluye-Boyer Ahmad To Errect Hydropowers

Besharati, A. (2017) A Survey To Find The Optimum Potentials In 5 Stations In kohkiluye-Boyer Ahmad To Errect Hydropowers. Masters thesis, University of Zabol.

[img]
Preview
Text
A Survey To Find The Optimum Potentials In 5 Stations In.pdf

Download (116kB) | Preview

Abstract

A Survey to Find the Optimum Potentials In 5 Stations In kohkiluye-Boyer Ahmad To Errect Hydropowers. Firstly, a station was peaked out throughout 5 stations (potential heads) on Seris river in Shahid Abad, considering the available potential head, discharge, and doability of the project, then the turbine type and penstock were designed for base flow for net available potential head and benefitcost ratio analysis basis, and six peak flow conditions were also considered and discussed. Finally, the forebay and downstream transmition channels were designed for the final case.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Electricity, Hydropower, Turbine, Economic Comparing
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering
Depositing User: Mrs najmeh khajeh
Date Deposited: 28 Jan 2019 08:47
Last Modified: 28 Jan 2019 08:47
URI: http://eprints.uoz.ac.ir/id/eprint/2358

Actions (login required)

View Item View Item